Case Study
More than 100 piles repaired at critical Port River Rail bridge
Hychem delivered a revolutionary structural rehabilitation solution for the Port River Rail bridge in South Australia, restoring 144 deteriorating concrete piles without the need for demolition. Utilising the innovative PileMedic™ FRP system, the project provided a durable, corrosion-proof solution that met all engineering requirements and design life expectations in an environmentally sensitive marine sanctuary.
Learn more